How to install a bucket elevator
First, the bucket elevator should be installed first fixed base, the base fixed on a reliable basis, and then in the base connected to the barrel, then connected to the head and install the gear motor.
2. After the alignment of the whole machine is installed, the barrel must be fixed to the floor at the floor through which the floor passes. If there are any attachments, the supports supporting the chassis should be installed to prevent the entire machine from tilting and displacing.
Third, the barrel connection pad gasket to ensure the degree of sealing.
4. The hopper of the hoist shall be installed on the hopper belt, and the hopper with the hopper shall be put into the hopper from both ends. Over the head wheel and the bottom wheel, operate the hole early to make the connection. When the hopper belt is installed, the bottom wheel should be set to a high position.
5. Adjust the head wheel axis to level so that the head and tail wheel shafts are in the same vertical plane.
6. The bucket elevator is a vertical conveying equipment. The central line of the head wheel, the bottom wheel and the barrel should be on the same vertical line. The deviation per meter length should not exceed 2 mm, and the accumulated deviation should not exceed 8 mm.
7. The hopper is installed in the hoisting machine. No skewing may cause the collision case to occur.
VIII. The tensioning device shall ensure that the hopper belt has the average tension necessary for normal operation.
Nine, when the bucket elevator is installed, add lube oil to each lubrication part to carry out no-load test, after the normal empty test, before carrying out load test and put into production. In addition, regular arrangements for special personnel to inspect the wear and tear of equipment, if there is damage to be replaced in time, so as to avoid damage to other parts of the wear and tear.