Project Name: Reconstruction and Expansion Project of Shanghai Dongfang Oasis International Youth Activity Center (April 2012-December 2013, RMB 80 million)
Region: Shanghai Progressive stage: preliminary design Construction period: April 2012 - December 2013 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities.
Project Profile: The project is located within the Second Village of the Global Village of Dongfang Oasis, No. 6888 Qingping Road, Qingpu District, Shanghai. It will construct two two- to three-story dormitories and will perform interior decoration of three two-story dormitory buildings up to three stories high. The building area is 16,402 square meters.
Total investment of the project: RMB 80 million.
Region: Shanghai Progressive stage: preliminary design Construction period: April 2012 - December 2013 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities.
Project Profile: The project is located within the Second Village of the Global Village of Dongfang Oasis, No. 6888 Qingping Road, Qingpu District, Shanghai. It will construct two two- to three-story dormitories and will perform interior decoration of three two-story dormitory buildings up to three stories high. The building area is 16,402 square meters.
Total investment of the project: RMB 80 million.
Construction unit: Oriental Oasis Postal address: 6888 Huqingping Road, Qingpu District, Shanghai Postal code: 201713
Contact: Hou Peitang Telephone, 59233058
Related Developments: Tower Crane Infrastructure Project
Stainless Steel Casting Parts,Rapid Prototyping Cost,Custom Metal Machining Parts,Complex Machining Part
Guangdong Fenghua Zhuoli Technology Co., Ltd , https://www.fhzl3d-printer.com