Jinmei Jinshi Chemical Industrial Park Chemical Equipment has all been in the park

Shanxi coal gold petrochemical industrial park project is currently under construction fiery, recently required chemical equipment have all arrived at the scene, will enter the formation, the installation phase, the main project is expected to be completed by the end of the year project. The main construction content of the first phase of the project is annual production of 180,000 tons of synthetic ammonia, 270,000 tons of double pressurized nitric acid, 200,000 tons of crystalline ammonium nitrate, 200,000 tons of porous ammonium nitrate, and 100,000 tons of methanol.

Double Shaft Hammer Mill

The double shaft Wood Hammer Mill has a large crushing output and uses internal cooling structure, which can avoid the damage to the hammer mill caused by high temperature during grinding


Double crushing chamber, double rotor, simultaneous positive and negative rotation, strong strike of double linear velocity in the center of material crushing, and axial air inlet and top air filling function.Efficiency is higher than ordinary Hammer Mill 35%~100%.


Cylinder guide mechanism, fully open shift operation door (door lock position protection device), stable operation, comprehensive safety protection measures, convenient operation and maintenance.

Hammer Mill Grinder,Rice Husk Hammer Mill,Biomass Hammer Mill,Double Shaft Hammer Mill

Shandong Kingoro Machinery Co., Ltd , https://www.sdkingoromachinery.com

This entry was posted in on