[ Pacific Auto Network Car Channel ] Why do we guess the maintenance price of the new Shengda? Because it has received a lot of attention, in general, new cars only have maintenance data for several months. For prospective car owners who like Xinshengda but don’t know how to maintain the price, let’s take a look at our “guess†Xinshengda maintenance price. article. Maybe after reading the article, it will help you.
â— Xin Shengda
Xinshengda, whether it is the long-wheelbase Santa Fe or the non-long-wheelbase new Sport (Santa Fe Sport), has added a new name to the design of the “fluid sculptureâ€. Design element for "Storm Edge". As the name implies, the design of “The Edge of the Storm†is inspired by the storm. Hyundai said that after adding the design elements of “The Edge of the Stormâ€, Xinshengda will let the car feel at a constant speed.
Modern Hyundai Shinda
With the addition of the "storm edge" design, the appearance must be changed. The front face of the new generation of new Shengda and the new Xinshengda is almost two people. According to visual inspection, a new generation of new Shengda made a total of six changes, the former headlights added white light eyebrows to replace the current LED daytime running lights, you can pay attention to the shape of the headlights, because the shape of the taillights is very commensurate with it. The design changes such as the intake grille are also expected. The models in the official map do not have a luggage rack design, but the actual car at the press conference has a luggage rack, so it can be inferred to be an optional accessory.
After understanding the changes in appearance, we began to understand the maintenance situation. Please look down.
â— Maintenance manual (complete vehicle warranty)
We know that imported modern brands include Verax, Yazun, Phase One, Huiyi, Cool, etc., except for Phase One , which has a warranty period of 3 years or 60,000 kilometers, and other models are 60 months or 100,000. Kilometers. From the modern maintenance policy of imports, we can guess that the warranty period of Xinshengda should be 60 months or 100,000 kilometers.
â— Maintenance manual (wearable parts warranty)
In terms of wearing parts, the battery can be replaced within 12 months or 20,000 km, and the air-conditioning refrigerant is within 12 months, but there is no limit on the number of kilometers. This is only limited to the current maintenance manual. The wearing parts are covered by the warranty.
However, we can see the "clutch piece" warranty period from the Cool "Maintenance Manual". Here we can roughly guess that the new Shengda will use the manual gearbox. According to the official exposure, the new win is 2.4L except for the 6-speed manual. In addition to the integrated transmission, a manual transmission has been added. Therefore, we have reason to believe that the "clutch disc" warranty project on Cool's "Maintenance Manual" will also appear on the new Shengda, and it also implies that the maintenance mileage is more than a manual transmission model maintenance, of course. It will only appear on the 2.4L model.
â— Maintenance manual (part warranty)
The part warranty project also appears in the Maintenance Manual. If you look through the parts warranty items of imported Hyundai, Yazun, Huiyi, Cool and other models, you will find that they use the same warranty period and warranty. Project, therefore, we have reason to believe that Xinshengda will also adopt the same quality assurance project and deadline; on the other hand, we can also implement the implementation of this policy from the newly listed Freescale and Coolpad, if it changes, then new Shengda may be "shrinking" because of domestic production.
â— Maintenance manual (part warranty)
In order to find the new insurance and maintenance policy of Xinshengda, we read the "Maintenance Manual" of Freescale, Yazun, Coolpad, Huiyi, etc., and found common ground in the "Maintenance Manual": the first maintenance is 3000 kilometers, The remaining 10,000 km, 20,000 km, 30,000 km and 50,000 km are all subject to a free maintenance policy. Therefore, we believe that Xinshengda will also adopt this maintenance policy.
In addition, we can also see from the above policy, the maintenance gap of the new Shengda is 10,000 kilometers of maintenance, compared to the domestic 5,000 km maintenance, the import Shengda maintenance costs will be cheaper than the domestic ones.
(function(prev, next){ window.PcGroupArticleHotKeyEvent = true; /* global variable, article page hotkey function master switch */ function keydownEvent(e){ var e = e||window.event; if(prev&&!e. ctrlKey&&!e.altKey&&!e.shiftKey&&e.keyCode==37&&window.PcGroupArticleHotKeyEvent) window.location.href=prev; if(next&&!e.ctrlKey&&!e.altKey&&!e.shiftKey&&e.keyCode==39&&window.PcGroupArticleHotKeyEvent) window. Location.href=next; } function specialHotKeyEvent(){ var list = []; for(var i=0,inputs=document.getElementsByTagName('input');i
Piling Pipe
purpose
In recent years, offshore deepwater Wharf Engineering in domestic coastal have also been large-scale construction, and as a deep-water wharf main bearing capacity of pile foundation, the widespread adoption of large diameter spiral welded Steel Pipe pile; in addition, bridges, roads, and other high-rise buildings need pile pipe.
Photo of our Piling Pipe:
General symbol marking
Nominal diameter of D: steel pipe, mm
Nominal wall thickness of T: steel pipe, mm;
M: steel pipe line quality, kg/m
Nominal outside diameter editing
219-3620mm, Zhengzhou Zhongyuan steel pipe company's production of spiral steel pipe diameter up to 3620mm;
Usual length editor
8.0---12m, according to the demand, the supply and demand sides agreed to supply the length beyond the usual length range.
Weight calculation editor
Generally calculated according to the weight of theory, but also the actual measurement of the two sides to negotiate;
Manufacturing method
Spiral steel pipe is a strip coil as raw material, often warm extrusion molding, automatic double wire double buried arc welding process of welding and the spiral seam pipe.
(1) raw material that is strip coil, welding wire, flux. Have to go through strict physical and chemical tests before they are put into the investment.
(2) strip head and tail docking, using single or double wire submerged arc welding, the steel tube rolled by automatic submerged arc welding welding.
(3) before molding, the strip passes through the leveling, trimming, planing, surface cleaning and conveying, and bending and handling. (4) using the electric contact pressure gauge to control the pressure of the cylinder on both sides of the conveyor, to ensure the smooth delivery of the strip.
(5) the external control or internal control roll forming.
(6) using the welding gap control device to ensure that the weld gap to meet the requirements of welding, pipe diameter, the wrong side of the amount and the weld gap are strictly controlled.
(7) welding and welding with the Lincoln Electric welding machine for single or double wire submerged arc welding, so as to obtain the stable welding specification.
(8) the welding seam after welding is through the online continuous ultrasonic automatic inspection, to ensure that 100% of the spiral weld nondestructive testing coverage rate. If there are defects, automatic alarm and spraying marks, the production workers at any time to adjust the process parameters, timely elimination of defects.
(9) the air plasma cutting machine to cut a single pipe.
(10) into a single tube, each batch of steel tube head to strict inspection system first, check the weld mechanical properties, chemical composition, blending, surface quality of steel pipe and after nondestructive inspection, to ensure that the pipe manufacturing technology qualified, can be formally put into production.
(11) in the weld on the site of continuous acoustic inspection marks, after manual ultrasound and X ray review, if there are defects, after repair, once again after the non destructive testing, until the defects have been eliminated.
(12) strip butt weld and intersecting and spiral seam D connector tube, all through X ray TV or film examination.
(13) each pipe is tested by hydrostatic pressure, and the pressure is sealed by radial seal. The test pressure and time are strictly controlled by the steel pipe water pressure computer testing device. Automatic print record of test parameters.
(14) the pipe end machining, the end verticality, accurate control of slope angle and blunt edge.
Material General requirements
Q235 or Q345. Can also be customized according to the needs of users;
Appearance quality editor
The surface of the steel pipe weld shall not have cracks, broken arc, arc pits and holes and other defects, there are defects in the welding seam to allow repair welding, defect repair or repair. The steel pipe is allowed to have the steel strip butt weld, and the steel pipe is welded with two pipe sections, and the butt welding can be carried out by submerged arc welding or manual welding process.
Pipe Piling,Steel Piling Pipe,Steel Pipe Piling,Pipe And Piling
Unisite Group Ltd. , https://www.shipsparts.nl