Project Name: Progress of Zhangjiajie Zhongle Gongyuan Family Project: Construction Drawing Design and Construction Period: 2011.4-2013.4
Major equipment: cranes, building materials, exterior wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instrumentation, water supply and drainage systems, fire protection systems, pipe fittings, water supply Equipment, outdoor drainage, building electrical, lighting fixtures, low voltage electrical appliances, wire and cable, weak point systems, lightning protection systems, low voltage distribution cabinets.
Project Description:
The project is located in Jiayongping, Dayong, Yongding District, Zhangjiajie, Hunan, north of Ziwu West Road, east bank of Wuxi River, with a total area of ​​46,389 square meters and a total construction area of ​​185,373 square meters, including several 25 to 27-storey residential buildings. , shops, clubs, parking lots.
The total investment of the project is 350 million yuan
Construction Unit: Zhangjiajie Zhongle Real Estate Development Co., Ltd. Postal address: Ziwu Road, Yongding District, Zhangjiajie, China Postcode: 416600
Contact: Liang Jianfeng Telephone Fax
Hydrogen Generation Reformer,Steam Catalyst Tube,Heat Resistant Reformer Tube,Heat Resistant Catalyst Tube
Taigoo Machinery Co. Ltd. , https://www.spun-castings.com